Tuesday, 27 September 2011

Shooting Schedule & Camera Angle Planning

Shooting Schedule

As most of our shots are on locations that are not close to home, we must wait untill the weekend in order to travel and spend an entire day shooting.

Friday 30th September - all day shooting road shots
Saturday 1st October - all day shooting field shots
Sunday 2nd October - all day shooting indoor/misc shots

Camera Angle Planning

I plan to have multiple different shots from various angles of the singer performing live in a studio, which means I can have a different shot for each line of the song but in the same location. I feel this will create continuity and allow the piece to look interesting.

Similarly, I plan to have different shots from various angles outdoors (in the field and the country road) as the band member plays his guitar and often when performing some vocals. This creates narrative in the piece and some continuity as I do not want the visuals to become too complicated but some differentiation will make the video interesting.

No comments:

Post a Comment